  • Power Plant(CHP)

    Client Aftab Tejarat Pars
    Location Shamsabad( Tehran)
    Contract Type Feasibility Study
    Product Electriciy Energy
    Production Capacity 6 MW
    Duration 1 Mounth
    Project Start 1395
    Project Finished 1395
  • Polyester String

    Client Nasajan Parseh Mehr Ris
    Location Gharchak( Tehran)
    Contract Type Feasibility Study
    Product Draw Textured Yarn (TYD)
    Production Capacity 5 T/D
    Duration 1 Mounth
    Project Start 1395
    Project Finished 1395
  • Low Density Polyethylene Production Plant

    Client Kurdistan Petrochemical
    Location Kurdistan
    Contract Type Supervision
    Product Low Density Polyethylene
    Production Capacity 300,000T/D
    Duration 54 Mounth
    Project Start 1389
    Project Finished 1394
  • Stone Paper Production plant

    Client Dorge Kerman
    Location Kerman
    Contract Type Conceptual Design
    Product Stone Paper
    Production Capacity 4,000 T/Y
    Duration 3 Mounth
    Project Start 1393
    Project Finished 1393
  • Catalyst production plant

    Client SARV Oil & Gas
    Location Pakdasht( Karaj)
    Contract Type Feasibility Study
    Product Catalyst ( SMR, DRI- Inert, DRI- Semi active, DRI- Active)
    Production Capacity 250 T/Y
    Duration 1 Mounth
    Project Start 1394
    Project Finished 1394
  • Car Equipment promotion plant

    Client Avrand Plastic
    Location Safadasht( Karaj)
    Contract Type Feasibility Study
    Product Mulilayer fuel tank, Mulilayer corrugated filler pipe, Evaporation corrugated pipes, Fuel filter, Fuel pump module, Canister, TPE weather strips.
    Production Capacity 36,000,000 Set/Y
    Duration 3 Months
    Project Start 1394
    Project Finished 1393
  • Power Plant(CHP)

    Client Ghodsniroo
    Location Azarbaijan
    Contract Type Feasibility Study
    Product Electricity Energy
    Production Capacity 4 MW
    Duration 2 Months
    Project Start 1394
    Project Finished 1394
  • Methanol Production Plant

    Client Grohe Rahbran Egtesadieh Arman
    Location Baku
    Contract Type Supervision
    Product Methanol
    Production Capacity 600,000T/D
    Duration 24 Months
    Project Start 1388
    Project Finished 1390
  • Carbon Active Production Plant

    Client Kimya Pajohan Giti
    Location Lurestan
    Contract Type Engineering- Procurement- Construction
    Product Carbon Active
    Production Capacity 1,750 T/D
    Duration 2 Years
    Project Start 1390
    Project Finished 1392
  • Acetic Acid Pilot Production Plant

    Client Petrochemical Research & Technology
    Location Bandaremam
    Contract Type Engineering- Procurement- Construction
    Product Acetic Acid
    Production Capacity 300T/Y
    Duration 2 Years
    Project Start 1383
    Project Finished 1385
  • Mini Refinery

    Client Azar Tejarat Jolfa Aras
    Location Jolfa (free zone)
    Contract Type Feasibility Study
    Product Condensate (Gasoline, Gas oil, Kerosene, Mazut)
    Production Capacity 175,000 T/Y
    Duration 3 Months
    Project Start 1391
    Project Finished 1391
  • Babajan Refinery

    Client Naftebabajan
    Location Mazandaran
    Contract Type Feasibility Study
    Product Oil Products
    Production Capacity 240,000 bbl/D
    Duration 6 Months
    Project Start 1387
    Project Finished 1387
  • Refinery Instrument (3 Projects)

    Client Tehran Refinery
    Location Tehran
    Contract Type Engineering- Procurement- Construction
    Product
    Production Capacity
    Duration 15 Months
    Project Start 1387
    Project Finished 1388
  • Condensate Refinery

    Client Toseeh Energe Hormozan
    Location Gheshm
    Contract Type Basic Design
    Product Condensate ( Gasoline, Gas oil, Kerosene, Mazut)
    Production Capacity 120 bbl/Y
    Duration 4 Months
    Project Start 1391
    Project Finished 1391
  • Pipe line

    Client NIOC
    Location Gure- Jask
    Contract Type Conceptual Design
    Product
    Production Capacity 1,000,000 bbl/D
    Duration 6 Months
    Project Start 1387
    Project Finished 1387
  • Condensate Refinery

    Client Toseeh Energe Hormozan
    Location Gheshm
    Contract Type Basic Design
    Product Condensate ( Gasoline, Gas oil, Kerosene, Mazut)
    Production Capacity 120 bbl/Y
    Duration 4 Months
    Project Start 1391
    Project Finished 1391
  • Tank Storage Plant

    Client Tide Water
    Location Anzali
    Contract Type Conceptual Design & Pre-Feasibility Study
    Product Storage
    Production Capacity 12,000 T
    Duration 2 Months
    Project Start 1387
    Project Finished 1387
  • Dehrolan Refinery

    Client Gohar Shid Mehr
    Location Dehrolan
    Contract Type Feasibility Study
    Product Oil Products
    Production Capacity 30,600,000 bbl. /Y (Crude oil)
    Duration 3 Months
    Project Start 1387
    Project Finished 1388
  • Power Plant(10 MW)

    Client Euroturbine
    Location Bandarabbas
    Contract Type Engineering- Procurement- Construction
    Product Turbine Installation
    Production Capacity 10 MW
    Duration 12 Months
    Project Start 1391
    Project Finished 1392
  • GTL Plant

    Client Saff-Rosemond
    Location Qeshm
    Contract Type Feasibility Study
    Product Oil Products
    Production Capacity 990,000 bbl. /Y
    Duration 1 Month
    Project Start 1393
    Project Finished 1393
  • Slab Production Plant

    Client Foolad Guilan
    Location Guilan
    Contract Type Feasibility Study
    Product Slab
    Production Capacity 2,500,000 T/Y
    Duration 1 Month
    Project Start 1392
    Project Finished 1392
  • Cyclohexane Production Plant

    Client Shimi Sanat Hegzan Ramshir
    Location Bandaremam
    Contract Type Feasibility Study
    Product Cyclohexane
    Production Capacity 100,000 T/Y
    Duration 2 Months
    Project Start 1389
    Project Finished 1389
  • Polymer Alloy Production Plant

    Client Razinpolymer
    Location Eshtehard
    Contract Type Supervision
    Product Polymer Alloy (PVB)
    Production Capacity
    Duration 18 Months
    Project Start 1389
    Project Finished 1390
  • Polymer Alloy Production Plant

    Client Razinpolymer
    Location Qom
    Contract Type Supervision
    Product Polymer Alloy
    Production Capacity
    Duration 12 Months
    Project Start 1390
    Project Finished 1391
  • Sub Transmission Transformers Production Plant

    Client Iran Power Planet Repairs
    Location Karaj
    Contract Type Feasibility Study
    Product Transformation
    Production Capacity 7,600 MVA/Y
    Duration 15 Months
    Project Start 1388
    Project Finished 1390
  • Power Plant(100 MW)

    Client Petro Aras Khavaremiyaneh
    Location Takestan
    Contract Type Conceptual Design
    Product
    Production Capacity 100 MW
    Duration 3 Months
    Project Start 1388
    Project Finished 1388
  • Incineration Power Plant

    Client Atrin Parsian
    Location Mazandaran
    Contract Type Feasibility Study
    Product
    Production Capacity 4.6 MW
    Duration 1 Month
    Project Start 1391
    Project Finished 1391
  • Polyester Production Plant

    Client Kaboodan Shimi
    Location Lurestan
    Contract Type Detail Design
    Product Polyester
    Production Capacity 50T/D
    Duration 1 Year
    Project Start 1387
    Project Finished 1388
  • Billet Production Plant

    Client Zobe Ahane Natanz
    Location Natanz
    Contract Type Supervision
    Product Billet
    Production Capacity
    Duration 3 Years
    Project Start 1390
    Project Finished
  • Calcined Petroleum Coke Production Plant

    Client Carbone Sanati Parsian Anod
    Location Behshahr
    Contract Type Supervision
    Product Calcined Petroleum Coke Production Plant
    Production Capacity
    Duration 18 Months
    Project Start 1393
    Project Finished
  • Maleic anhydride Production Plant

    Client RADHA
    Location Abadeh
    Contract Type Pre-Feasibility Study
    Product Maleic anhydride
    Production Capacity 20,000 T/Y
    Duration 1 Month
    Project Start 1390
    Project Finished 1390
  • MDF Production Plant

    Client Choobe Feshordeh Khazar
    Location Salman Shahr (industrial city)
    Contract Type Feasibility Study & Engineering & Supervision
    Product MDF
    Production Capacity 500 m3/D
    Duration 36 Months
    Project Start 1385
    Project Finished 1388
  • Major Over hall

    Client Tehran Refinery
    Location Tehran
    Contract Type Over hall Project Management
    Product
    Production Capacity
    Duration 1 Month
    Project Start 1386
    Project Finished 1386
  • Melamine Production Plant

    Client Kimyae Fars
    Location Fars
    Contract Type Engineering
    Product Melamine
    Production Capacity 4.5 T/D
    Duration 2 Months
    Project Start 1385
    Project Finished 1385
  • Chlore Alkali

    Client Chloro Pars
    Location Tabrize
    Contract Type Supervision
    Product Chlore
    Production Capacity 20 T/D
    Duration 36 Months
    Project Start 1374
    Project Finished 1377
  • Melamine Production Plant

    Client Urmia Petrochemical
    Location Urmia
    Contract Type Supervision
    Product Melamine
    Production Capacity 10 T/D
    Duration 24 Months
    Project Start 1372
    Project Finished 1374
  • Zink Production Plant

    Client Zob Rooy Bafgh
    Location Bafgh
    Contract Type Supervision
    Product Zink
    Production Capacity 100,000 T/Y
    Duration 24 Months
    Project Start 1374
    Project Finished 1376
  • Bioleaching Pilot Plant

    Client National Iranian Copper Industries
    Location Kerman
    Contract Type Engineering
    Service Bioleaching
    Production Capacity 11,000 T/Y
    Duration 10 Years
    Project Start 1378
    Project Finished 1388
  • MTBE Production Plant

    Client NPC
    Location Arak
    Contract Type Pre-Feasibility Study
    Product MTBE
    Production Capacity 50,000 T/Y
    Duration 6 Months
    Project Start 1382
    Project Finished 1382
  • Tile Production Plant

    Client Kashi Shirkooh
    Location Yazd
    Contract Type Engineering
    Service Tile
    Production Capacity 40,000,000 m2/Y
    Duration 2 Years
    Project Start 1377
    Project Finished 1379
  • Tile Production Plant

    Client Kashi Kageh
    Location Kermanshah
    Contract Type Feasibility Study
    Product Tile
    Production Capacity 15,000,000 m2/Y
    Duration 3 Months
    Project Start 1384
    Project Finished 1385
  • Guilan Refinery

    Client Guilan Governor
    Location Guilan
    Contract Type Pre-Feasibility Study
    Service Oil Products
    Production Capacity 110,000 bbl. /D
    Duration 3 Months
    Project Start 1377
    Project Finished 1378